3D rendering for construction

Pre-construction visualization for contractors, design-build firms and developer-builders. Tender boards, phasing, site logistics and the sales set, cut from the model your design team already built.

  • One fixed per-project price and a delivery date within 30 minutes
  • Phasing and site setup shown as images, not as a programme bar chart
  • Full usage rights: tender, hoarding, brochure, portal, press

We only take a limited number of projects each month, so every scene gets top quality.

3D rendering for construction: a site manager reviewing a render of the new residential towers on his laptop in a site cabin, drawings pinned behind him
1,247
Projects completed
13
Years in business
17
Countries delivered to
★★★★★ Rated 5.0 on Clutch · See our reviews

Architects, developers & interior designers

Working for 215 companies since 2013

125 of 220 clients came back

More than half of our clients have hired us again

Most of the people deciding cannot read a drawing

A section tells a site manager everything and tells a client, a councillor or a funder almost nothing.

The model is built once, from your drawings or your IFC export. After that a tender board, a planning image, a site logistics view and a brochure spread are all crops of the same thing.

A construction project spends months explaining itself to people who are never going to learn to read an elevation. The client's board, the planning committee, the neighbours at a consultation, the funder, and the site team on day one. Each of those conversations tends to get its own set of exports and its own misunderstanding, and the misunderstandings are the expensive part.

We have been rebuilding buildings from drawings since 2013. What we produce is images, not a coordination service. What that buys you is the ability to put one picture on the table and have the room argue about the right thing.

Untextured model of a residential scheme, the geometry every later image is cut from
Exterior rendering of a commercial building block, Miami, USA

When to send the first drawings

The earliest useful trigger is the date your tender return is fixed, not the date the design is finished. A tender board can be built from a coordination-stage model with placeholder cladding, because the panel is judging massing and site relationship first.

A hoarding is a print job, not a screen job

Read from the pavement at building scale, a hoarding needs a different resolution and crop than a board-pack image. We ask what a view is for before we render it, and deliver it sized to the panel.

See the work first.

What the images do at each stage of a build

01

Winning the work before the drawings are finished

A tender or a design-build bid is judged partly on whether the panel can picture the result. A clay massing view and two photoreal frames answer the question the drawings leave open, which is what the thing will be like to stand next to.

The scene is kept after delivery, so a shortlist stage that asks for a different roofline or a change of cladding does not restart the job. The second version comes off the model that already exists.

Turf-roofed cabin in the mountains, one roofline option off the same model, Norway
02

Phasing, access and what the site looks like on a Tuesday

Site setup, crane position, hoarding line, compound, haul route, and the order the blocks come out of the ground. Shown as views a client or a neighbour can read in three seconds rather than as a bar chart nobody outside the team follows.

On a phased scheme the same model gives you phase one occupied while phase two is still a site. That is the image that stops a buyer discovering by accident that they are moving in next to two more years of work.

Aerial of a residential masterplan laid out across its site, Sweden
03

The sales and letting set out of the same model

By the time you are on site, the model has already been paid for. The brochure images, the hoarding graphic, the portal listing and the leasing pack are further crops of it, and every one of them costs a fraction of the first view.

Handover works the same way. A case study for the next bid can be rendered on the day of practical completion, instead of eighteen months later when the planting has finally grown in enough to photograph.

Brick mixed-use frontage with active shopfronts, the kind of image a letting pack leads on

Four things a construction team actually orders

Most jobs are some mix of these. The fourth is the one people forget to ask for until the sales suite opens.

Modern house at dusk, rendered for the sales pack before the site is cleared, USA

Pre-construction stills

The building finished, at 4K, lit to a real hour. Tender boards, board packs and the hoarding, long before there is anything on site to photograph.

Aerial of a logistics building beside a motorway showing its access and yard, Finland

Aerial and site context

The scheme from above with the real access, boundary and neighbours. This is the view that settles the site questions, and usually the one the planners keep.

Aerial animation frame of an industrial site, Finland

Phasing and flythrough animation

Sequence as motion: what is built when, how the site is entered, how the plots hand over. Short clips built for a presentation, not for a film festival.

3D floor plan of a residential floor, Norway

Site plans and floor plans

Coloured site plans and 3D floor plans for the sales suite, the marketing board and the consultation display, drawn off the same model so they agree with the renders.

3D rendering for construction, read by three different rooms

The same scene and the same camera discipline, in front of three audiences that are judging different things.

Exterior rendering of a low-rise commercial building, Latvia

The bid room

A design-and-build tender is scored on more than the drawings: the panel is also judging whether you understand the site. A camera that shows the real access and the real neighbours reads as competence, not just as a picture.

Aerial rendering of a terraced housing scheme showing its site layout and access, Finland

The site induction board

Before a phase starts, the crew running it needs the compound, the haul route and the exclusion zone in one frame. The same aerial camera built for the client board does this job too, at no extra build cost.

Rendering of a transit station concourse, a publicly funded scheme, Sydney, Australia

The funder's board pack

A lender or an investment committee is reading the scheme for risk. A photoreal set next to the programme and the cost plan is what lets them sign off a drawdown without a site visit, usually the same set built for tender, reused rather than rebuilt.

A studio partner, not a render farm

Globe and clock, illustrating European delivery across time zones

European delivery, workable time zones

An Estonian studio working since 2013 across the Nordics, the Baltics, Europe, the UK, the US, Canada and Australia. Comments in the evening, a revised frame by morning.

Signing a confidential agreement, illustrating NDA as standard

Confidentiality as standard

Unconsented schemes, competition entries and unannounced launches are commercially sensitive. We work under NDA without being asked and never publish a project without permission.

Two professionals discussing drawings, illustrating direct communication

You brief the artist, not a queue

No account-manager layer. Send the files, get a real number, talk to the person building the scene. Fewer hand-offs is why the first preview lands closer to right.

A consistent set of framed renders, illustrating one visual language

One consistent visual language

Across a set, or across years of repeat work, the light, materials and camera discipline hold. Ten freelancers cannot do that, and it is visible on page four of a brochure.

In-house, outsourced, or a bit of both

None of this is a BIM decision. It is a resourcing one.

Your BIM team stays on coordination

A tender board, a hoarding graphic or a phasing image is a building rendering job, not a clash-detection job. Handing that one output to us keeps your in-house team on the critical path instead of on a render queue.

Start with one image, not the whole programme

Most jobs begin with a single tender view and grow once the bid is won. The scene is kept between requests, so a later ask for phasing stills or a flythrough is priced as an addition, not a restart.

NDA before the RFP goes out

A competitive tender is sensitive before you have won anything. We sign under NDA at first contact, not after a contract, and nothing is shown or published without your written permission.

Four stages, whatever you commissioned

CAD drawings and elevations on a laptop at the brief stage
Brief

Brief and fixed quote

Upload CAD, PDF, Revit or SketchUp files, or a photo of a sketch. We prepare the brief from your files, so there is no questionnaire. You get one fixed project price and a delivery date within 30 minutes.

Clay model of a market-hall interior, no materials and no light yet
Days 1-3

Clay model

We build the 3D model without materials and place the camera. The viewpoint, lens, height and time of day are agreed on this grey model, when changes are quick and cheap.

Preview render of the same market-hall interior from the same camera, in daylight
Week 1

Preview render

The same view with materials, lighting and surroundings added. You see it early, while the light and the finishes can still be changed easily. 2 revision rounds are included, and we keep refining until you approve.

Final render of the same market-hall interior in evening light, fully dressed
Delivery

Final render

The approved image, fully finished and delivered in 4K, with larger sizes for print on request and full usage rights. Every further view in the set uses the scene already built, so each extra image costs much less than the first.

Schemes photographed before they existed

Industrial, logistics, commercial and residential work from the Nordics, the Baltics and further out. Jobs under NDA are not shown here, which on the contractor side is most of them.

Aerial rendering of a retail and logistics park with its yards and parking, Estonia
Rendering of a low office and warehouse building with flagpoles, Finland
Aerial rendering of a distribution warehouse and its loading yard, Finland
Street view rendering of a community building at dusk, Estonia
Waterfront apartment building, the finished building rendered from the drawings, Norway
Rendering of a limestone-clad industrial building, Estonia

What moves a construction rendering quote

Priced per project, not per image. This is what changes the number.

  • Number of views and formats

    A tender board, a hoarding graphic and a portal listing are different crops of the same scene, but the first one carries the cost of building it. Each added view after that is markedly cheaper.

  • Site and neighbouring context

    A dense urban infill with neighbours to model adds time against a green-field site with an open approach. Access and boundary treatment both count.

  • How firm the bid deadline is

    A standard hero view runs about a week. A bid due in three days is not refused, but it changes what gets agreed on the clay view first.

  • Whether later phases reuse the scene

    A one-off tender image and a scheme that returns for phasing, a hoarding and a handover set are priced differently, because the second and third requests are built on a model that already exists.

Rendering of a mixed-use residential and retail building, Estonia
Free guide

The Construction Rendering Buyer's Guide

What moves the quote, and what to send to get it fast.

  • What moves a construction quote up or down
  • The exact files to send for a fast tender price
  • How to brief a hoarding versus a board-pack image
  • No sales call, one fixed price back in 30 minutes

Opens the upload form. Send what you have; no sales call.

How we plug into your workflow

You do not need a tidy file set to get a price, and you do not need to wait for the design team to finish drawing.

What we accept

DrawingsPDF, DWG, plans, sections, elevations. A photographed markup is enough to quote from
ModelsRevit, IFC, ArchiCAD, SketchUp, Rhino or 3ds Max, as they are, not a cleaned export
Site informationSurvey, site photographs, a drone pass, or a street address. Context is modelled, not faked
The programmePhase boundaries and dates, where the images have to show a sequence
SpecificationCladding, glazing, roofing, paving. Where it is not fixed, we render an option and label it as one

What you receive

Stills4K as standard, higher on request, cropped for the board pack and the hoarding
Clay views firstCamera, massing and sun agreed on an untextured model before any of the costly work
AnimationPhasing sequences and flythroughs at lengths a presentation can actually use
Usage rightsFull and unlimited. Tender, brochure, hoarding, portal and press, with no per-use fee
The scene, keptHeld after delivery, so phase two, a cladding change or one more camera is a small job

What else comes off the geometry

Dusk rendering of a retail park frontage, Estonia

Exterior rendering

Facades, streetscape and the approach, for the marketing set.

Exterior rendering
Coloured ground floor plan of a family house with its terrace, Norway

Site plan rendering

Coloured plans that show the layout, the access and the landscape.

Site plan rendering
Aerial animation frame of an apartment scheme, Norway

3D animation

Phasing sequences and flythroughs cut from the scene already built.

3D animation
Untextured exterior model built from architectural drawings

3D modelling

The model on its own, from your drawings, when images come later.

3D modelling

Construction rendering FAQs

The questions we are asked most before a project starts. Still unsure? Send the drawings and we will tell you what we would do with them.

Ask us directly
What is 3D rendering for construction?
Rebuilding a scheme as a 3D model from the drawings or the design team's model, then producing images and short animations of it before or during the build. On a construction job those images do four things: they help win the work at tender, they explain the scheme to clients, planners and neighbours, they show phasing and site logistics, and they become the marketing set for sales, letting and handover. It is judged on whether the room understood the building faster.
Do you do BIM coordination or clash detection?
No. We are a visualization studio, not a BIM consultancy. Clash detection, 4D programme linking, quantity take-off and structural coordination are not things we do, and we would rather say that in the first email than in the third meeting. What we will do is take your federated model as a starting point, build a visualization scene from it, and hand your model back untouched.
Can you work from our Revit or IFC model?
Yes, and it is usually the fastest start. Send it as it is. We do not need a cleaned or purged export, and it does not have to be complete: missing landscape, missing context and placeholder cladding are normal at this stage. Where the model is thin we model the rest from your drawings, and we tell you which parts we filled in.
Can you show construction phasing?
Yes, as a set of stills per phase, as a short animation, or both. The sequence itself comes from your programme: we visualise the order you give us, we do not produce or validate a programme. In practice a phasing set is one aerial camera held still across four or five states of the site, because the value is in the frames being comparable.
How much does a construction render cost?
Per project rather than per image, because a single tender view and a phased development set are not the same job. The drivers are the number of views, how complex the scheme and its context are, and how complete your files are. Extra angles of a building we have already built cost markedly less than the first one. Send what you have and you get one fixed number and a date within 30 minutes.
How fast can you turn a tender image around?
A single hero view is about a week, and a set of six to twelve images runs two to three weeks. You see an untextured clay view within days, which is where camera, massing and the hour of the day get settled while changing them is still cheap. If a bid deadline makes that impossible, say so when you send the files, because it changes how we schedule it.
Can we use the images in a tender and on the hoarding?
Yes. Usage rights are full and unlimited, included in the project price, with no per-use or per-channel fee. Tender submissions, planning applications, hoardings, brochures, portals, press and your own website are all covered. We work under NDA as standard and publish nothing without written permission, so the rights run one way: you get everything, we show nothing you have not cleared.
What happens when the design changes mid-job?
2 revision rounds are included, then refinement until you sign off. After that the scene is kept, so a later change comes back to a model that already exists rather than to a fresh start. We will be straight with you about which kind of change it is: moving a camera or relighting an hour is small, and moving the building or reworking the context is a new piece of work with its own number.
Do you attend site visits or the tender interview?
No. Everything runs on the files you send and a video call if one is useful, not a site visit or a seat at the panel. Presenting the images at the interview or the consultation is yours to do; we will turn round a same-day tweak if a question in the room changes what a camera should show.
Can you work on a project in my country?
Yes. Since 2013 we have delivered work in 17 countries, all of it remotely, and a construction job is no different. The drawings, the model and the site photographs arrive by file transfer, the clay view and the revisions go back the same way, and a video call covers whatever an email cannot. The only thing your location changes is when in the day that call happens, not the delivery date.

Send the bid drawings, get one fixed price before the tender closes

Contractors, design-build teams and developer-builders: a number and a delivery date within 30 minutes, whether or not the design is finished.

We take a limited number of projects each month.