👋 Need 3D Services?

Hello there! Let’s discuss your project. Our 3D specialists will contact you in 30 minutes!
Elis Kostabi
Team lead
3Dstudio.co
Masterplan aerials, eye-level views and consultation imagery for urban planning teams, architects and developers. The scheme drawn honestly into the site it is really going into, because a committee that catches one flattering detail stops believing the rest of the pack.
We only take a limited number of projects each month, so every scene gets top quality.
Architects, developers & interior designers
Working for 215 companies since 2013
125 of 220 clients came back
More than half of our clients have hired us again
A masterplan visual enters an urban planning process and stays in it. It is read by an officer writing a recommendation, by objectors with time on their hands, and by neighbours who know the road better than you do.
So the neighbours are modelled from survey rather than from memory, the planting is drawn at the size it will be on the day of handover, and the camera stands where the viewpoint schedule said it would stand. Everything else on this page follows from those three rules.
Objectors are good at catching the opposite. A tree at a height it would take decades to reach, a neighbouring roofline quietly dropped by a storey, a viewpoint moved fifteen metres up the road so a gable falls out of frame. Any one of them, found once, and every other image in the pack is in question. Schemes rarely fail on the exaggeration itself. They fail on what it suggests about the drawings nobody has checked yet.
The discipline is not complicated, it is just unglamorous. Model what is there. Show what is proposed. Where the information ran out and an assumption had to be made, name the assumption in writing next to the image, before anyone else has to find it.
Urban design rendering is not decorative. Its job is to let a viewer test the massing against what is already on the ground: heights against the buildings either side, the roofline against a skyline that already exists, the shadow a new block throws across a garden that predates it. Get that test wrong and the image becomes the reason a scheme fails, not the reason it succeeds.
A single master plan visualization, built once from survey and the scheme drawings, is where every later image comes from: the committee aerial, the eye-level viewpoints, the consultation boards and the phasing set. Rebuild the context separately for each output and the pack ends up disagreeing with itself.
See how it holds up in the selected work below.
Submission images go on a public register and are read next to the officer's report and whatever objection letters have arrived. So they have to be referable: numbered, each tied to a marked position on the site plan, so a recommendation can cite view 04 and the room is looking at the same frame.
Viewpoints get agreed with you, or against the authority's schedule, before anything is rendered. Members who know that road have stood on it, and if the frame does not match what they remember, the meeting stops being about your scheme.

A public meeting is a room of people who did not ask for your scheme and have mostly decided how they feel about it. Flattering images make that worse: the first person to spot the flattery gets the room for the rest of the night.
What works is eye level, ordinary weather, real ground level, and the public realm at the size a person walks through it. A board people can stand in front of and argue with honestly is worth more than a hero shot they distrust.

Every eye-level frame answers one objection from one position. The aerial is where the scheme gets judged whole: how it meets the streets already there, where one phase stops and the next starts, and what somebody two roads away will be looking at. That is city visualization as much as it is architecture. Plans carry all of that, and almost nobody in the room reads plans that way.
It draws on the same working scene as the street views, so the two agree. Splitting an aerial and a viewpoint set across two suppliers is how a submission ends up contradicting itself in public.

A submission, a consultation and a sales launch want different frames. They should not need different models, or the pack ends up with numbers that do not match.
The whole site in one frame: boundary, access, roofscape, landscape and the neighbours it has to sit next to. The image the plans cannot replace.
The view from the corner people actually stand on, at the height a person actually is. Numbered, agreed and recorded before the camera moves.
Squares, paths, planting and the ground between the buildings. The part a consultation asks about first and most submissions render last.
Same camera, same light, across existing, phase one and complete. A set that changes the weather between frames is not a comparison.
Outline, full and revised submissions all draw on the same site model. What changes is how much rigor the stage demands.
Before a scheme is drawn in detail, a pre-application meeting or an early consultation usually wants an honest answer to one question: how does this sit against what is already there. An untextured clay aerial answers it without pretending to be a finished material choice.
The bulk of the work on this page: numbered viewpoints tied to a site plan, an aerial that reads the whole scheme, and a public realm set built for the officer's report and the meeting that follows it.
A refusal, or a revised recommendation after consultation, does not mean rebuilding the scene. Context, cameras and light are already set, so a resubmission is a new set of frames from the existing model.
An Estonian studio working since 2013 across the Nordics, the Baltics, Europe, the UK, the US, Canada and Australia. Comments in the evening, a revised frame by morning.
Unconsented schemes, competition entries and unannounced launches are commercially sensitive. We work under NDA without being asked and never publish a project without permission.
No account-manager layer. Send the files, get a real number, talk to the person building the scene. Fewer hand-offs is why the first preview lands closer to right.
Across a set, or across years of repeat work, the light, materials and camera discipline hold. Ten freelancers cannot do that, and it is visible on page four of a brochure.
A schedule with two views and one with fourteen are different jobs. Ask the case officer directly if none has been issued yet: guessing high wastes budget, guessing low means a second round before the deadline.
Where the survey stops, an assumption starts. Naming it in writing next to the image, before anyone else finds it, is worth more to a committee than a flawless render with something quietly missing.
A scheme that is still moving after submission is normal. Keeping the scene, rather than treating each round as a new project, is what makes a second set fast enough to hit a re-consultation deadline.

Upload CAD, PDF, Revit or SketchUp files, or a photo of a sketch. We prepare the brief from your files, so there is no questionnaire. You get one fixed project price and a delivery date within 30 minutes.

We build the 3D model without materials and place the camera. The viewpoint, lens, height and time of day are agreed on this grey model, when changes are quick and cheap.

The same view with materials, lighting and surroundings added. You see it early, while the light and the finishes can still be changed easily. 2 revision rounds are included, and we keep refining until you approve.

The approved image, fully finished and delivered in 4K, with larger sizes for print on request and full usage rights. Every further view in the set uses the scene already built, so each extra image costs much less than the first.
Schemes where the ground, the boundary and the neighbours were as much of the job as the architecture.






Priced per project, not per image. This is what changes the number.
A single infill plot and a forty-hectare masterplan are different jobs. The site boundary and how much of the surrounding area has to be recreated set the scene-build cost before a viewpoint is counted.
An authority's schedule might specify two views or fourteen. Each one shares the same underlying scene, so the second view costs less than the first, and the twelfth costs less again.
A topographic survey and cadastral extract get us straight to modelling. Missing information has to be approximated and disclosed, which adds time even where it does not add much to the fee.
A scheme that changes after consultation is a revision to an existing scene, not a new build, so later rounds are priced well below the first.
What moves the quote, and what to send to get it fast.
Opens the upload form. Send what you have; no sales call.
Planning work arrives messier than a marketing brief and usually with a submission date already fixed. Nothing below assumes a tidy file set.
Individual buildings inside the masterplan, at the detail a sales launch needs.
Exterior rendering
The drawn version: coloured, labelled and readable by someone who is not an architect.
Site plan rendering
A flythrough for the consultation evening and the committee screen, cut from the same scene.
3D animation
The full range, for when the scheme also needs interiors and a marketing set.
Architectural visualizationThe questions we are asked most before a project starts. Still unsure? Send the drawings and we will tell you what we would do with them.
Ask us directly
Planning consultants, developers and authority teams: one number and a delivery date within 30 minutes, viewpoints agreed before anything renders.
We take a limited number of projects each month.